Works carried out in 2025:
- Right engine landed and brought back to 0 hours, overhaul 2 water exchangers, 2 exhaust risers, 2 turbines, rebuilt aftercooler, new fresh water pump
- Windlass with remote control and meter counter, new anchor chain
- Replaced VHF and tridata radios
- Replaced electric pistons with hydraulic ones for garage tenders